Progress Log
John Waters
Design Week 13: 4/4-4/11
This week the team continued preparing the testing results for presentation. Writing of the first draft of the project report was also...
John Waters
Design Week 12: 3/28-4/4
After a day of troubleshooting on Sunday, the team decided to meet as many times this week as possible to conduct testing of the device....
John Waters
Design Week 11: 3/21-3/28
This week the team continued finalizing the project in preparation for device testing. The team met on Tuesday again at West campus in...
John Waters
Design Week 10: 3/14-3/21
This week the team continued to hustle towards the rapidly approaching 90% completion deadline. During their weekly Tuesday meeting on...
Hunter Keating
Design Week 9: 3/7-3/14
Over the Spring break the team moved into overdrive to push the project along. The team met during the week to test the power amp...
Hunter Keating
Design Week 8: 2/28-3/7
This week the team met again on West Campus to conduct some more testing on the CODEC and DAC output circuit. Unfortunately the team...
Hunter Keating
Design Week 7: 2/21-2/28
This week the team continued working on the input and output stages of the device. The team met on Tuesday at West Campus to troubleshoot...
John Waters
Design Week 6: 2/14-2/21
This week the team met at the west campus open lab to test the power supply prototype board. The Power Supply passed our maximum...
Hunter Keating
Design Week 5: 2/7 - 2/14 (Week 20)
This week the team completed preparations for testing the Power Supply. Construction of the supply with switching regulators was...
John Waters
Design Week 4: 1/31 - 2/7 (Week 19)
This week the team continued working on the power supply, Arduino/touchscreen UI, and microphone preamp. Team Tuesday afternoon the team...
John Waters
Design Week 3: 1/24 - 1/31 (Week 18)
This week the team met throughout the week to expedite the completion of the AC-DC power supply, DER / Success Criteria documents, and...
John Waters
Design Week 2: 1/17-1/24 (Week 17)
This week the team worked on assembling some of the device's modules, preparing future posts, and revising some of the proposal...
John Waters
Design Week 1: 1/10-1/17 (Week 16)
During the first week of the design/implementation semester, the team began working on the preliminary steps of implementation. This...
John Waters
Winter Break
Over the break the group purchased a large list of components needed for implementation of the project. All passive and active components...